Most important projects

Wind Farm Carrecastro 10 MW

Wind Farm Carrecastro 10 MW

Location:

Tordesillas y Velilla (Valladolid) 

Commissioning:

December 2019

Scope:

  • Developing
  • Engineering
  • Management
  • Commissioning of the wind farm
  • Operation
  • IPP

Technology:

Wind

Wind Turbines:

4

Wind Turbines Model:

Siemens Gamesa 114-2.5 MW

Installed Power:

11,69 MW

Transformation Substation:

20/45KV

Matabuey Wind Farm 16 MW

Matabuey Wind Farm 16 MW

Location:

Garciahernández (Salamanca)

Commissioning:

February 2010

Scope:

  • Developing
  • Engineering
  • Management
  • Commissioning of the wind farm
  • Operation

Technology:

Wind

Wind Turbines:

8

Wind Turbines Model:

VESTAS V-90 (2 MW)

Installed Power:

16 MW

Transformation Substation:

20/132 KV 

Concejiles Wind Farm 11.69 MW

Concejiles Wind Farm 11.69 MW

Location:

Sorihuela (Salamanca)

Commissioning:

December 2008

Scope:

  • Developing
  • Engineering
  • Management
  • Commissioning of the wind farm
  • Operation

Technology:

Wind

Wind Turbines:

7

Wind Turbines Model:

Alstom ECO80 - 1670 (1.64 MW)

Installed Power:

11,69 MW

Transformation Substation:

20/132 KV

Guadalta Photovoltaic Plant 6 MWp

Guadalta Photovoltaic Plant 6 MWp

Location:

Manzanares (Ciudad Real)

Commissioning:

2006

Scope:

  • Developing
  • Engineering
  • Management
  • Commissioning of the wind farm
  • Operation and IPP

Technology:

Photovoltaic

Installed Power:

6 MW

Transformation Substation:

15/45 KV

Project Management of the Wind Farm Hiperión II 50 MW

Project Management of the Wind Farm Hiperión II 50 MW

Location:

Suellacabras (Soria) 

Date:

June 2010/May 2011

Owner:

EON RENOVABLES

Scope:

  • Project Management
  • Commissioning of the wind farm

Technology:

Wind

Wind Turbines:

20

Wind Turbines Model:

General Electric 100-2.5MW

Installed Power:

50 MW

Transformation Substation:

30/66 KV

Project Management of the Wind Farm La Lora I y II 99,2 MW

Project Management of the Wind Farm La Lora I y II  99,2 MW

Location:

Valle de Valdelucio (Burgos) 

Date:

April 2010 / June 2011

Owner:

EYRA, S.A.

Scope:

  • Project Management
  • Commissioning of the wind farm

Technology:

Wind

Wind Turbines:

62

Wind Turbines Model:

Alston ECO 80 - 1670 (1.64 MW)

Installed Power:

99,2 MW

Transformation Substation:

20/132 KV

Project Management of the Wind Farm Marmellar 49,5 MW

Project Management of the Wind Farm Marmellar 49,5 MW

Location:

Pedrosa del Río Urbel y Marmellar de Abajo (Burgos) Spain 

Date:

December 2005/November 2006

Owner:

EYRA, S.A.

Scope:

  • Project Management
  • Commissioning of the wind farm

Technology:

Wind

N. Wind Turbines:

33

Wind Turbines Model:

General Electric 1,5 SLE (1,5 MW)

Installed Power:

49,5 MW

Transformation Substation:

20/132 KV

Project Management of the Wind Farm Lodoso 49,5 MW

Project Management of the Wind Farm Lodoso 49,5 MW

Location:

Pedrosa del Río Urbel and Lodoso (Burgos)

Commissioning:

December 2005/November 2006

Owner:

EYRA, S.A.

Scope:

  • Project Management
  • Commissioning of the wind farm

Technology:

Wind

Wind Turbines:

33

Wind Turbines Model:

General Electric 1,5 SLE (1.500 KW)

Installed Power:

49,5 MW

Transformation Substation:

30/132 KV

Project Management of the Wind Farm Touriñan IV 24,65 MW

Project Management of the Wind Farm Touriñan IV 24,65 MW

Location:

Irixoa, Aranga y Monfero (A Coruña) Spain 

Date:

Decembre 2005/July 2006

Owner:

EYRA, S.A.

Scope:

  • Project Management
  • Commissioning of the wind farm

Technology:

Wind

Wind Turbines:

29

Wind Turbines Model:

Gamesa 52 (850 KW)

Installed Power:

24.65 MW

Transformation Substation:

20/132 KV

Project Management of the Wind Farm Chumillas 45 MW

Project Management of the Wind Farm Chumillas 45 MW

Location:

Chumillas (Cuenca) Spain 

Date:

March 2005/December 2006

Owner:

Urbaenergía – Elecdey CLM

Scope:

  • Project Management
  • Commissioning of the wind farm

Technology:

Wind

Wind Turbines:

25

Wind Turbines Model:

Gamesa 80 (1.800 KW)

Installed Power:

45 MW

Transformation Substation:

20/132 KV

Licenses of Wind Farm Projects and Wind Measurement Campaigns

Licenses of Wind Farm Projects and Wind Measurement Campaigns

Los Concejiles (11,9 MW)

Ruta de la Plata (25,5 MW)

Los Barranquillos (50 MW)

Los Mesones (50 MW)

Morro del Cuervo (50 MW)

Matabuey (16,2 MW)

El Carpio (3,6 MW)

Épila (5 MW)

Monte Gordo (48 MW)

Sierra de los Alijares (24 MW) 

Sierra de Argallen (50 MW) 

Sierra del Astorgano (18 MW) 

Sierra de Frontocillos (42 MW) 

Sierra de Guadamez (12 MW)